Through a lean and flat organizational structure, plus a strong network of experienced trades and engineers, FRCI minimizes overhead costs, and maximizes value provided to clients. FRCI uses local contractors where possible to keep resources within your community.

Parker Bridge: The Parker Bridge had been closed for several years due to structural damage including rot in the timber stringers. Pier Solutions was awarded the work to rehabilitate the bridge and extend the life of the bridge. Repairs included a strengthening a pile damaged by ice, strengthening the span of the bridge where the stringers were rotten, and repairs to both abutments.








Parker Bridge